MV8 Installation Options

MV8 Series air traffic control rooms are available as a kit, complete with detailed assembly instructions. Alternatively, a TEX ATC Project Manager can oversee the installation.

 

 


A fully illustrated step-by-step assembly manual is included with every MV8 air traffic control room. Depending on location, a TEX ATC Project Manager can supervise local labour.

The manual identifies the component parts and quantities, and explains the construction process in approximately 40 steps. For example, steps 1-16 explain how to erect the steel frame, and the following steps detail the installation of the roof, curtain wall and glazing. The final steps cover the installation of the interior finishes and solar blinds.

The assembly manual includes a list of the lifting equipment and tools required, the main items being a crane and a glass vacuum lifter.

It is expected that assembly may be completed within 8 weeks.

See also Standard SpecificationOptional Extras, Scope of Work and ProgrammeDownload MV8 Series brochure.